Main Extension excavation & levelling
|
|
|
|
Brick revetted elevation
|
|
|
|
Setting shuttering for main-lines
|
|
|
|
Laying concrete track foundations
|
|
|
|
Vibrating float plate
|
|
|
|
|
Track adjustment and securing
|
|
|
|
Down-Main extension nearing completion
|
|
|
|
Using the Aquaseal trombone to damp-proof sleepers
|
|
|
|
Extension approaches the original loop
|
|
|
|
Extension ready to join station and shed area
|
|
|
|
|
The work on underground storage begins
|
|
|
|
Pouring of the roof begins at the east end
|
|
|
|
Six roads of 90 ft for underground storage
|
|
|
|
Bunker covered and Erimus marshalling yard begins to form
|
|
|
|
Some of the extensive stock that made the bunker necessary
|
|
|
|
|
Crossovers and Erimus Yard loops going in
|
|
|
|
A final covering of cosmetic ballast completes the Erimus Yard
|
|
|